background image

Westinghouse  Type 

F-122 

Oil  Circuit-Breakers 

ttagnet 

Cti·cuit 

Tripping Spring 

Coil 

Armature 

FIG.12-HAND  RETRIEVE  UNDER VOLTAGE  RELEASE 

Tripping Spring 

Re5et 

Lever 

FIG.  13-AUTOMATIC  RETRIEVE  UNDERVOLTAGE  RELEASE 

that  the  tripping  functions  will  be 

properly  performed.  A  little  oil  on  the 
bearings  at  intervals  will  keep  the parts 

in 

good  operating  condition. 

Other 

Devices-Though  there 

is 

nothing  about  the  construction  of the 

other  auxiliaries  and  tripping  devices 

which  would require the attention of the 
operator  periodically,  yet  it  is  recom­
mended  that  the  tripping  devices  be 

given  a  casual  inspection  to  see  that 

cotter  pins  have  not  become  lost  and 

that  screws  and  bolts  are tight.  Moving 

parts should be operated  by  hand  to see 
that  they  are  free  on  their  bearings  and 
do  not  bind. 

Description  and  Adjustments 

of  Auxiliaries 

Rod 

Stationary  Core 

Tube 

locK  Nut 

The  handle  trigger  holds  the  handle 

lever  down  after  the  circuit-breaker  has 

been closed by pushing  the handle.  The 

auxiliaries  will  operate  to  disengage  the 

trigger from  the  tap  lever.  Raising  the 
handle disengages the handle trigger and 
permits  the breaker  unit  to  open. 

The  coverplate  is  made  in  three 

arrang=ents,  the  two-coil  single-handle 

coverplate 

is 

used  on  non-automatic  or 

automatic  single-throw  breakers  unless 
special  requirements  demand  the  three­

coil single-handle coverplate. 

The  double-handle  coverplate  is  used 

with  all  automatic  and  non-automatic 

motor  starting combination of  breakers. 

A  special  assembly  of  this  double­

handle  coverplate  can  be  used  with 
motor  starting  combinations. 

It  is 

provided  with  a  pin  to  operate  the 
automatic  retrieve  undervoltage  release 
and  latches  are  removed  from  starting 

side  so  that  it  is  impossible  to leave  the 

motor  running  on  starting  voltage. 

Undervoltage 

Release-The  hand  re­

trieve  undervoltage  release  must  be 
connected  so  as  to  leave  the  coil  de­
energized  when  the  circuit-breaker  is 
open.  This  may  be  done  by  energizing 

from  the  load  side  of  breaker  or  wiring 

through  the  signal  switch.  Upon  the 
reduction  of  the  voltage  across  the  coil 
to  approximately 

50 

per  cent  of  the 

normal  voltage,  the  armature  will  be 

TubQ 

Corg 

Oasn  Pot Clam� 

Piston 

Nut 

Dash 

Pot 

Coverplate-

The  coverplate  contains 

the  operating  handle  with  space  for 

overload  coil,  auxiliary  switch,  bell 
alarm,  undervoltage  and  other  auxil­
iaries.  The  operating  handle  is  in  two 
parts.  The  trip  lever  is  attached  to  the 

breaker unit through a rod at the rear of 

the 

panel and  engages  the  trigger in the 

handle  lever  on  the  front  of  the  panel. 

Frc.  14-0VERLOAD  RELEASE  CoRES 

12 

www 

. ElectricalPartManuals 

. com 

Summary of Contents for F-122

Page 1: ...w w w E l e c t r i c a l P a r t M a n u a l s c o m ...

Page 2: ... 8 Mechanical Interlock 8 Mechanical Sequence Interlock 10 16 Mounting of Auxiliaries 8 10 Overload Release 14 Panel Bracket 15 Panel Frame Mounting Bracket 15 Pipe Bracket 15 Pipe Structure 15 Signal Switch and Beii Alarm 10 Tripping Devices 10 Undervoltage Release Attachment 10 12 General Description 3 Installation 3 Insulating Oil o 6 Mounting of Circuit Breaker Units 0 6 Switchboard Breaker Pa...

Page 3: ...ection covering adjustment 5 Operate the circuit breaker by hand several times watching each pole and the operating mechanism to be sure all parts move smoothly and freely 6 When the mechanism is remote mounted adjust the connections between the breaker and operating mechanism so that full contact is obtained and the breaker rests on the bumpers when in the open position 7 Install connections to t...

Page 4: ... Toggl Lever Lmks Set toggle to this dim F Closing Lever Ooer RodEnd Assem foruu __ _ oush ordown 4 puff L_ Assem 11 for down pull operation Stationaryarc shield Tanh LiftRod t icarta il l 1 f t Terminal I I l Bushing Dash Pot IIIH Details FIG 3 BREAKER PoLE UNIT SIDE VIEW CRoss SEcTioN 4 w w w E l e c t r i c a l P a r t M a n u a l s c o m ...

Page 5: ...increase as is the case with plain copper contacts carrying large currents In fitting new contacts it is unnecessary that perfect line contact be obtained With the comparatively soft material silver good contact is obtained after a few operations as the silver flows slightly under pressure If the silver contacts on the moving contacts are replaced use solder of at FIG 4 THREE POLE BREAKER UNIT FRO...

Page 6: ...s Only the highest grade such as Wemco C or other approved oil should be used in the breakers The oil should be new or at least thoroughly reconditioned by means of a filter press or centrifuge In any case before using it should be given a dielectric test which should show a minimum of 22 000 volts preferably 25 000 to 30 000 measured between l inch diameter discs spaced 1 inch apart Before fillin...

Page 7: ... two coil coverplate should be discarded The coverplate can then be mounted as shown in Fig 8 with the coils in place in the coil box The tripping cores can then FIG 6 SINGLE HANDLE 2 COIL COVERPLATE be put in place on the coverplate and tightened Here again if an under voltage release is used it may be placed on the coverplate after it is assembled to the panel by pushing the leads through the cl...

Page 8: ...k out device mounts on the side of the breaker unit and is attached to the breaker frame as shown in Fig 18 It is necessary to replace the standard pin in the breaker operating lever by the special large headed pin supplied with the device It should be observed that the armature moves freely and that with the armature closed the large headed pin has clearance to pass while wit hthe coil de energiz...

Page 9: ...2 Oil Circuit Breakers Arrangement for J pipe mtg hand oper mechanism 14 600 800Amps i I I Arrangement for lj wall mtg Mr l n I I FIG 8 REMOTE CoNTROL MouNTING DETAILS 9 w w w E l e c t r i c a l P a r t M a n u a l s c o m ...

Page 10: ...lts clamps the undervoltage release tightly in the proper position After it is completely mounted operate it a few times by hand to see that the movement is free and that it operates properly See Fig 12 The automatic retrieve undervoltage release mounts on the right hand side of the coverplate in a similar manner It is necessary to bolt a reset pin to the trip lever of the coverplate to operate th...

Page 11: ...se Type F 122 Oil Circuit Breakers FIG DouBLE HANDLE 3 COIL COVERPLATE Stortinq ionrJ g FIG 11 DouBLE HANDL 2 CoiL CovitRPLATE FOR MoTOR STARTING EQuiPMENT 11 w w w E l e c t r i c a l P a r t M a n u a l s c o m ...

Page 12: ...rang ents the two coil single handle coverplate is used on non automatic or automatic single throw breakers unless special requirements demand the three coil single handle coverplate The double handle coverplate is used with all automatic and non automatic motor starting combination of breakers A special assembly of this double handle coverplate can be used with motor starting combinations It is p...

Page 13: ...e careful to leave it bearing over its entire area The coils are marked with their style number the style number of the series resistor and the voltages and frequencies on which they may be used Reference to these should be made in all corre spondence regarding the device The device is made for use with or without resistor depending upon whether it is desired to trip the breaker by short circuitin...

Page 14: ...l dashpot is attached to the end of the moving core The calibration is then inscribed on the dashpot and is varied by screwing the pot into the cover The time is varied by changing the number of the holes in the bottom of the piston un covered by the cliaphragm Instanta neous tripping is possible because the check valve action of the washer at the time of tripping varies inversely with the amount ...

Page 15: ...n completely opened of angle iron provided with standard third if the running handle is not thrown pipe fittings and holes so that the breaker in within a very limited period of time unit is bolted to the angle iron and the after the starting handle is opened it angle iron is held to the pipe will be impossible to close the running Pipe Structure The pipe structure side without first throwing in t...

Page 16: ...draw it from in front of the running handle pin and allowing the running handle pin to raise as would occur if the running side of the circuit breaker had started to close Thus it is easy to see that it is impossible to close the running side of the circuit breaker until the starting side has been fully closed and has reached its full open 16 position At the opening of the circuit breaker the inte...

Page 17: ...IP COIL CO ECTIO S I I I OJ Di Bkr n co Orer ood Relay 8 lhpCoJ 01rect Tn 0 1 ii JAttachment G r Seriesljold mr Co FIG 26 B ScHE vtATic DIAGRAM oF CoNNECTIONS FOR DIRECT TRIP ATTACHMENT Mounting Surface C 0 0 II I I I 1 r I T 3 Q psol 440112201 110 I 0 I UV I UV II 241 Q l r II II II II 7 II I II 0 Transformer I 0 9 32 Dia 2 Mtg Holes For 1 4 Dia Fil Hd Mach Screws FIG 27 DRILLING PLAN AND OUTLINE...

Page 18: ...MEMORANDA w w w E l e c t r i c a l P a r t M a n u a l s c o m ...

Page 19: ... 3 CONN 119 Ann St HOUSTON 2 TEXAS 507 Dallas Ave HUNTINGTON I W VA 1029 Seventh Ave P O Box 1150 INDIANAPOLIS 2 IND 1560 Stadium Drive JACKSON MICH 120 W Michigan Ave JACKSONVILLE 6 FLA 1520 Prudential Bldg 841 Miami Road KANSAS CITY 6 MO 101 W Eleventh St LOS ANGELES 17 CALIF 600 St Paul Ave REV 7 56 LITTLE ROCK ARK 707 Boyle Bldg 103 W Capitol St LONG BEACH CALIF 2129 Pacific Ave LOS ANGELES 17...

Page 20: ...w w w E l e c t r i c a l P a r t M a n u a l s c o m ...

Reviews: