WHL-016 Rev. 4.14.16
32
Figure 18 - Venting with Optional Kits (NOT INCLUDED WITH THE
BOILER)
NOTE:
These drawings are meant to demonstrate system
venting only. The installer is responsible for all equipment and
detailing required by local codes.
All vent pipes must be glued, properly supported, and the
exhaust pitched a minimum of 1/4” per foot back to the boiler to
allow drainage of condensate. When placing support brackets
on vent piping, the first bracket must be within 1 foot of the
boiler and the balance of 4 foot intervals on the vent pipe.
Venting must be readily accessible for visual inspection from
the first three feet from the boiler.
NOTES:
A. For every 1” of overhang, the exhaust vent must be located 1”
vertical below overhang (overhang means top of building structure
and not two adjacent walls [corner of building]).
B. Typical installations require 12” minimum separation between
bottom of exhaust outlet and top of air intake.
C. Maintain 12” minimum clearance above highest anticipated snow
level or grade (whichever is greater).
D. Minimum 12” between vents when installing multiple vents.
E. 12” minimum beyond air intake.
Figure 19 - Horizontal (Snorkel) Venting
Summary of Contents for WBC 399
Page 14: ...WHL 016 Rev 4 14 16 14 Figure 6 Boiler Dimensions NOTE All Dimensions Are Approximate 055 080 ...
Page 21: ...WHL 016 Rev 4 14 16 21 Figure 9 Piping Symbol Legend ...
Page 42: ...WHL 016 Rev 4 14 16 42 Figure 33 Internal Connection Diagram ...
Page 65: ...WHL 016 Rev 4 14 16 65 Figure 37 Combustion System Replacement Parts 55 110kBTU Models ...
Page 67: ...WHL 016 Rev 4 14 16 67 Figure 39 Combustion System Replacement Parts 155 399kBTU Models ...