WHL-052 Rev. 4.28.16
49
Table 20 - Maintenance Reminder Function Screens
G. Resetting the Maintenance Schedule
When the system control flashes MAINTENANCE REQUIRED,
it is advisable that you call for service. After the service is
performed, reset the schedule for the next required service by
using the following steps.
Press
ENTER
on the display for 3 seconds. The Menu code
will appear as 000. This does not change. Press
ENTER
again.
SERVICE SCHEDULE RESET will be displayed. Using the
>
key
scroll to the selection of year or hours. Press
ENTER
to reset
the selected Service Schedule. To change a setting, press
ENTER
. Press the
^
and
v
keys to make adjustments. Press
ENTER
when reset is complete.
Function 34
Month
SERVICE SCHEDULE
MONTH 00/00/2000 34
If the date function was selected,
this function programs the month. If
you selected the run hour function,
you will need to program 10,000
hours, if required.
Hours
SERVICE SCHEDULE
10000’s 00
00
00 34
Allows the user to set the middle
two digits of the amount of run
hours before next service reminder.
Function 35
Day
SERVICE SCHEDULE
DAY 00/00/2000 35
Sets the day of next service
reminder.
Hours
SERVICE SCHEDULE
10000’s 0000
00
35
Sets the two right digits of the
amount of run hours for the next
service reminder.
Function 36
Telephone
TELEPHONE #
000 000 0000 36
Allows the user to input a telephone
number that will display when
maintenance is required.
Part 10 - Start-Up Procedures for the Installer
Table 21 - Heating Curve - NOTE: The user can adjust the heat curve
down by lowering the central heating temperature.
A. Boiler Control Status Menu
The boiler control also has the ability to review system status.
To access the status screens, press
>
. Once the first value is
displayed, press
^
and
v
to scroll through additional information.
At any point press
RESET
to exit the status screens.
Summary of Contents for WBRE110
Page 13: ...WHL 052 Rev 4 28 16 13 Figure 5 Boiler Dimensions NOTE All Dimensions Are Approximate ...
Page 37: ...WHL 052 Rev 4 28 16 37 Figure 25 Internal Connection Diagram ...
Page 62: ...WHL 052 Rev 4 28 16 62 Figure 30 Combustion System Replacement Parts 80 220kBTU Models ...
Page 63: ...WHL 052 Rev 4 28 16 63 Figure 31 Combustion System Replacement Parts 299 399kBTU Models ...
Page 64: ...WHL 052 Rev 4 28 16 64 Figure 32 Cabinet Replacement Parts All Models ...
Page 65: ...WHL 052 Rev 4 28 16 65 Figure 33 Cabinet Replacement Parts All Models ...