5/12/2017
TECH-538/D.W.O. 23160
Page 98 of 189
3.
Check if the ICoT is in Standby mode as shown in the “Type” column.
Figure 8-54 – ICoT in Standby mode
In this example, the ICoT is physically connected to the second FF network (P2) of the DeltaV controller. To
commission the ICoT in the DeltaV system, drag it from the “Decommissioned Fieldbus Devices” list and drop it in
the DeltaV controller FF network
P02
.
Figure 8-55 – Commissioning ICoT in the P02 Network