Westweld LTD
Office:
No.51, Xuefu Avenue, Nanan, Chongqing 400074 , China
9
Figure 1
Figure 2
B
. Wire feed roll installation
1. There are 4 wire wheels (0.8/1.0/1.2/1.6mm), two sides are different models and different core
diameter. Please install same diameter wheels. If use 1.2mm welding wire, please install the wire
wheel mark 1.2mm is outside (Figure 2)
2. When installation, stick the welding wire in the slot and then clamp again (Figure 3)
Figure 3
Figure 4
C.
Wire feeding tube installation
1. After placing the wire into the feeding tube, insert, then tighten the screw (Figure 4)
2. When installing the wire feeding pipe, remove the copper nozzle and match the corresponding
copper nozzle (Figure 5)