4
Parts and Hardware List
Please read completely through the instructions and verify that all listed parts and hardware are present
before beginning assembly.
A- Top Panel (Qty. 1) B- Left Side Panel (Qty. 1)
C- Right Side Panel (Qty. 1) D- Bottom Panel (Qty. 1)
E- Adjustable Shelf (Qty. 2) F- Top Back Stretcher (Qty. 1) G- Back Panel (Qty. 1)
(1) Cam Lock (2) Cam Bolt (3) M8 x 30 mm Wood Dowel (4) M4 x 12 mm Screw
(Qty. 12) (Qty. 12) (Qty. 16+1 extra) (Qty. 18+1 extra)
(5) Shelf Pin (6) Floor Leveler Tipping Restraint Hardware Kit (Qty. 2)
(Qty. 8) (Qty. 4)
(Included in plastic bag)
Tools required (not included): Phillips screwdriver, stud finder, pencil, tape measure, power drill and 1/8 in drill bit.