16
UPPER BUNK ASSEMBLY
17.
With the pilot holes as a guide, align and attach one Guardrail Support (R) to the center of the Long
Guardrails (P) and the Upper Mattress Side Rail (N) with three 30 mm Screws (9).
18.
Repeat the same procedure to attach the other Guardrail Support (R) to the Short Guardrails (O) and the
Ladder Side Rail (M).
R
9
UP
UP
R
M
O
O
N
P
P
9
4 mm x 30 mm Screw
(6 used in this step)
⑨