10
I N S T A L L I N G Y O U R A I R C O N D I T I O N E R
6.
Pull the support angle against the outside
of the structure. Tighten two
7
⁄
16
" long
machine screws on top of the support
platform.
7.
Adjust the leveling bolt to position the
support angle in a level plane. This will
allow for proper angle. Tighten the
leveling bolt locknut. The air conditioner
must be tilted back slightly to facilitate
proper condensate disposal.
NOTES:
Be sure the window track is
securely attached to the building con-
struction. Use longer screws into the
subframing if necessary.
Do not drill a hole in the bottom pan.
The air conditioner is designed to operate
with approximately
1
⁄
2
" of water in the
bottom pan.
8.
Cut two pieces of adhesive back foam
seal equal to the height of the window
opening. Remove backing and apply to
the vertical inside edges of the window
frame and sliding sash that will rest
against the air conditioner.
9.
Replace the sliding sash in the
window frame.
Support
platform
Window
stool
Lower
window track
Foam seal
Filler panel
Top retainer
Channel
Foam seal
Sliders
Support
angle
Outside
wall
Leveling bolt
lock nut
Leveling bolt
Two
7
⁄
16
" long
machine screws