The installer must ensure the presence of the following structural facilities among other things:
- Ventilation grid for the motor(s) of at least 100cm².
nd
- A 2 ventilation grid for natural ventilation (to the extent possible, they should be placed as far apart
as possible).
- Inspection hatch(es) of at least 40 x 50cm for service access (at least to the motors).
Riho recommends that an inspection hatch should be placed near the overflow opening.
- Hot and cold water supply.
- Water drain
- Electrical connection 230V/50Hz. Fixed connection with earth leakage circuit breaker.
4-6 mm² earthing connection to the whirlpool frame.
- Splash-proof rim around the whirlpool.
- We recommend that the whirlpool be
a separate group so that the installation receives
sufficient power.
The installer should pay special attention to the following points before installing the bath:
- Check the bath and the whirlpool for possible defects before installation. No dismantling costs will be paid
in the case of defects found after installation. After installation, Riho can only give a guarantee on hidden
defects.
- When transporting and installing the bath, do not hold it by
and jets.
- Check the whirlpool for leaks before installation.
- The whirlpool bath must be clear of the wall, so that unavoidable vibrations caused by the motor are not
transferred to it. The use of bath insulation tape between the bath rim and walls is recommended this will
reduce the noise level.
- If plastic panels are installed, pay attention to the height of the panel with respect to the bottom edge of
the bath. The panel should be at least 5mm from the floor, for ventilation purposes.
In case of doubt, consult a plumbing specialist.
Pre-installation
- Potential difference equaliser
connected to
the pipes, hoses
1.2
Whirlpool installation
All Riho
are made of
(see description:
baths) and equipped with a
. The following system models are available:
1. Hydro-system
(side jets with water + air)
2. Aero-system
(bottom jets with air)
3. Hydro/Aero system
(a combination of both systems)
Please refer to the Riho price lists for details of all the possibilities.
Whirlpool baths
acrylic
acrylic
Whirlpool bath as per
customer's choice
1.3
Delivery:
Generally, all whirlpool systems are fully installed, functionally tested and packed.
ATTENTION! Before installation, check the bath for damage if any, as well as material and/or manufacturing defects.
For this remove, the cardboard packaging. In order to prevent damage during installation, allow the foil to remain as
long as possible and remove it only at the last moment. After installation, Riho can only give a guarantee on hidden
material defects. Check the foil for scratches and damage if any. If these are present, check the bath itself to see
whether it is damaged. For this, remove as little foil as necessary in order to protect the
as properly as possible
during installation. In case of doubt, consult a plumbing specialist.
All Whirlpool baths are supplied without a PU drain-overflow.
bath
!
Whirlpool Electronic -
User manual
Votre revendeur : DUVIVIER sàrl - www.duvivier.lu
Summary of Contents for RIHO
Page 2: ...NL Z1209003 4 NL Votre revendeur DUVIVIER sàrl www duvivier lu ...
Page 18: ...GB Z1209003 4 GB Votre revendeur DUVIVIER sàrl www duvivier lu ...
Page 34: ...D Z1209003 4 D Votre revendeur DUVIVIER sàrl www duvivier lu ...
Page 50: ...F Z1209003 4 F Votre revendeur DUVIVIER sàrl www duvivier lu ...
Page 64: ... 64 Figure 11 F Z1209003 4 F Votre revendeur DUVIVIER sàrl www duvivier lu ...
Page 66: ...Z1209003 4 F Votre revendeur DUVIVIER sàrl www duvivier lu ...
Page 67: ...Enjoy the RIHO life style Votre revendeur DUVIVIER sàrl www duvivier lu ...