17
Horizontal Right to Left
Horizontal Left to Right
Install Condensate Disposal
Upflow Installation
IMPORTANT: The condensate drain should be routed directly to
a locally acceptable disposal area. The condensate drain line
should not be run directly to the outdoors especially in colder
climates where temperatures may cause the condensate to
freeze in the drain line.
1. Connect the
¹⁄₂
" (1.3 cm) NPT x
³⁄₄
" (1.9 cm) PVC adapter
(supplied) in the drain on the side that the draining will occur.
NOTE: The condensate can be drained from either the right
or left side of the furnace.
2. Connect the plastic pipe plug opposite of the drain.
3. Connect
³⁄₄
" (1.9 cm) PVC pipe, make a connection from the
adapter just installed to extend just outside the furnace.
Install a
³⁄₄
" (1.9 cm) PVC tee as shown.
4. From the PVC tee, connect the drain to the disposal area.
NOTE: The top of the PVC tee must be left open for proper
condensate drainage. The open end of the PVC tee must be
oriented so that the condensate does not run out of this
opening.
Condensate Disposal
A. 2" x 2" x
¹⁄₂
" (5.1 cm x 5.1 cm
x 1.3 cm) ppt supplied in kit
B. To vent pipe
C. 3" (7.6 cm) nipple supplied in kit
D. Flue pipe
A
B
C
D
A. 2" x 2" x
¹⁄₂
" (5.1 cm x 5.1 cm
x 1.3 cm) ppt supplied in kit
B. To vent pipe
C. 3" (7.6 cm) nipple supplied in kit
D. Flue pipe
A
D
B
C
A.
¹⁄₂
" (1.3 cm) NPT plug
(supplied)
B.
³⁄₄
" (1.9 cm)
PVC pipe
C. PVC tee (must remain open)
D.
¹⁄₂
" (1.3 cm) NPT x
³⁄₄
" (1.9 cm) PVC
adapter (supplied)
T
H
RU.
59.69/56.64
A
B
C
D
Summary of Contents for WFCT