4
TOOLS AND PARTS
Gather the required tools and parts before starting installation.
Read and follow the instructions provided with any tools listed
here.
Tools needed for all installations:
Level
Tape measure
Pliers
Remove parts package from dryer drum. Check that all parts
are included.
Parts needed:
(Not supplied with dryer)
Check local codes. Check existing electrical supply and venting.
See “Electrical Requirements” and “Venting Requirements”
before purchasing parts.
Mobile home installations require metal exhaust system hardware
available for purchase from the dealer from whom you purchased
your dryer. For further information, please refer to the “Assistance
or Service” section in your “Use and Care Guide”.
Parts supplied (all models):
Flat-blade screwdriver
Adjustable wrench that
opens to 1" (25 mm) or
hex-head socket wrench
Tin snips (new vent
installations)
Caulking gun and compound
(for installing new exhaust vent)
Vent clamps
1/4"( 6 mm) nut driver
(recommended)
Tools needed for gas installations:
8" (203 mm) or 10"
(254 mm) pipe wrench
8" (203 mm) or 10"
(254 mm) adjustable wrench
(for gas connections)
Pipe-joint compound
resistant to LP gas
Utility knife
“Y” connector
2' (0.6 m) inlet hose
5' (1.5 m) Inlet Hose
Rubber washer
Parts supplied (steam models):
INSTALLATION REQUIREMENTS
Leveling legs (4)
Summary of Contents for WGD7300XW
Page 18: ...18 SÉCURITÉ DE LA SÉCHEUSE ...
Page 19: ...19 ...