Page 13
16938-3-0806
OPTIONAL STONE INLAY INSTALLATION
WIRE CHANNEL INSTALLATION
The ON/OFF/REMOTE switch with harness
is factory installed into the switch box.
After the firebox is installed into the casting
the wire channel can be installed.
1. Attach switch box on the left side of rear
cover with (2) 10 x 1/2" screws.
2. Route wires from ON/OFF/REMOTE
switch within wire channel.
3. Attach wire channel on the left side of the
rear cover with (4) 10 x 1/2" screws.
4. Attach the black and green (wires) female
push-ons to the TH/TP and TH (two outside
male tabs) terminals on gas valve.
Figure 12
Whenever the standard grill top is replaced with a stone inlay you
must install the top shield and heat shield, which are provided with
the stone inlay.
Installation of Optional Stone Inlay
1. Remove left grill, center grill and right grill from casting top.
2. Remove casting top from outer casting.
3. Place the casting top on a non-abrasive surface in order to protect
the porcelain finish. The exterior of the casting top should be
facing the non-abrasive surface.
4. Attach 11 5/8" x 11 5/8" top shield to the interior of the casting
top with (1) 3/8" bolt provided in hardware package.
5. Locate the (4) screw holes on the heat exchanger top. The screw
holes are 8 3/4" apart. Position the angled front edge on the 12"
x 19 3/8" heat shield with the front of the firebox. Align the (4)
tabs with clearance holes on the 12" x 19 3/8" heat shield with
the (4) screw holes on the heat exchanger top. Attach the 12"
x 19 3/8" heat shield to the heat exchanger top with (4) 1/2"
hex-head screws provided in hardware package.
6. Place the casting top onto the casting. The casting top nests into
the casting.
7. Insert center stone inlay, left stone inlay and right stone inlay
into casting top.
8. Installation of stone inlay is completed.
Parts List
Part Description
Part
Number
Quantity
Supplied
11 5/8" x 11 5/8" Top Shield
CI-091
1
12" x 19 3/8" Heat Shield
CI-092
1
3/8" Bolt
R-3646
1
1/2" Hex-Head Screw
R-2737
4