FRAMING AND FINISHING
Installing Support Brackets
Install a horizontal pipe support used for each 3 feet of horizontal
run to framing members. Allow 3 inch clearance to combustibles
above 8 inch diameter pipe and elbows and 1 inch clearance on
both sides and bottom.
Support vertical runs of this vent systems every 4 feet using wall
brackets attached to the vent pipe and secured with nails or screws
to structural framing.
Note:
Maintain minimum 2 inch clearance between stud
ZDOODQGRXWVLGHGLDPHWHURISLSHZLWKLQWKH¿UVWLQFKHV
DERYHÀXHRXWOHW
Figure 47
Installing Firestops
Firestops are required for safety whenever the vent system passes
WKURXJKDQLQWHULRUZDOODQH[WHULRUZDOORUDFHLOLQJ7KHVH¿UHVWRSV
DFWDVD¿UHEUHDNKHDWVKLHOGDQGDVDPHDQVWRLQVXUHWKDWPLQLPXP
clearances are maintained to the vent system.
Horizontal Firestops
Horizontal runs in the vent system which pass through either interior
RUH[WHULRUZDOOVUHTXLUHWKHXVHRIZDOO¿UHVWRSVRQERWKVLGHVRI
the wall through which the vent passes.
3RVLWLRQWKH¿UHVWRSVRQERWKVLGHVRIWKHIUDPHGKROHSUHYLRXVO\
cut. Refer to
Figures 49 - 51
on Page 28 for sizing information.
6HFXUH¿UHVWRSZLWKQDLOVRUVFUHZV7KHKHDWVKLHOGVRIWKH¿UHVWRSV
MUST BE placed towards the top of the hole. Continue the vent
UXQWKURXJKWKH¿UHVWRSV
NAILS, 4 REQUIRED
Figure 48
NOTE:
SD58DVAWTEC Wall thimble is necessary to maintain
the required three inches of clearance to combustibles above
the vent. Framed hole dimensions shown above are for this wall
thimble.