Installation Instructions; -SDO Separate Drain Overflow
WARNING
Turbine assembly is provided with a 3-way plug. The
third prong functions as a built-in ground and must be
plugged into a matching grounded receptacle to
properly ground the product.
WARNING
NOTE: THESE INSTALLATION
INSTRUCTIONS ARE USED FOR
ALL WHITEHALL OR DAKON
ALL STATIONARY -SDO MODELS.
COMPLETELY LUBRICATE THE PLUNGER ASSEMBLY.
E-
CLOCKWISE, THEN FULLY COUNTERCLOCKWISE TO
HANDLE 5 . INTERNAL BUSHING MAY NEED ADJUSTMENT.
7
B-
A-
LEVEL OF AGITATION AND PRESSURE.
E-
UNTIL THE PUMP 12 IS AT THE DESIRED LOCATION. TIGHTEN
PUSHING DOWN ON TOP OF THE MOTOR SUPPORT CASTING 14
D-
C-
CLOCKWISE, THIS PROVIDES MAX PRESSURE AND AGITATION.
B-
WATER LEVEL SHOULD BE A MAXIMUM OF 4" BELOW THE RIM
A-
INTO LOWER BRACKET 9 , TIGHTEN SCREW 10 .
D-
ASSEMBLY 4 AND TIGHTENING HANDLE 5 .
MOTOR SUPPORT ROD 6 INTO RAISING AND LOWERING
LOWERING ASSEMBLY 4 BY LOOSENING HANDLE 5 , SLIDING
C-
A-
(SEE DETAIL A) NOTE: FOR INFORMATION ON OPTIONAL
THERMOSTATIC MIXING VALVE CONTACT FACTORY.
B-
2
10
3
4
5
6
9
TURN THE PRESSURE CONTROL VALVE HANDLE 11 FULLY
TURN HANDLE 15 CLOCKWISE TO OPEN DRAIN VALVE 16 .
TURN OFF SWITCH 13 .
ADJUST PRESSURE CONTROL VALVE 11 TO DELIVER DESIRED
ADJUST RAISING AND LOWERING ASSEMBLY 4 BY SLOWLY
TURN ON THE SWITCH 13 .
TURN THE PRESSURE CONTROL VALVE HANDLE 11 FULLY
FILL TUB AS DESIRED USING THERMOSTATIC MIXING VALVE.
INSTALL THERMOMETER 7 THRU UPPER BRACKET 8 AND
INSTALL MOTOR/TURBINE ASSEMBLY 3 INTO RAISING AND
ROUGH-IN FOR 2" OD DRAIN LINE 1 AND WATER INLET VALVE.
LOCATE TANK AND SECURE WITH "L" BRACKETS 2 , WITH
8
F-
REFERENCE DRAWINGS
ASSEMBLIES
RAISING/LOWERING/SM
MOTOR/TURBINE
9
15
PAGE NUMBER
24
25
DRAIN OVERFLOW E
DRAIN OVERFLOW H/S
PROVIDE ELECTRICAL SERVICE AND PROPERLY INSTALLED,
GROUND FAULT CIRCUIT INTERRUPTER (GFCI) FOR MOTOR
SPECIFIED. MOTOR SPECIFICATIONS AVAILABLE ARE EITHER
120V AC / 60 HZ ON 15A CIRCUIT OR 240 V AC / 50 HZ ON 10A
AND A MINIMUM OF 6" ABOVE BOTTOM PUMP 12 .
ASSEMBLY PROCEDURE:
OPERATION PROCEDURE:
DRAINING PROCEDURE:
INSTALLER PROVIDED FLOOR ANCHORS AND ANCHORING
HARDWARE. MAKE WASTE CONNECTIONS 1 .
1
1
11
12
13
14
15
DETAIL "A"
(TOP VIEW)
C
L
RAISING/LOWERING
16
23
DRAIN OVERFLOW - P
THERMOMETER
27
3
1
2
"
1"
3
4
"
7
7
8
"
16
Installation Instructions; -SDO Separate Drain Overflow
7