All information, illustrations and specifications in this manual are based on the latest information
available at the time of publication. We reserve the right to make changes at any time without notice.
21
2.0. Assembly
2.6. Electrical adjustment of the blowout nozzle
Screw eye bolt
(A)
into the
thread on the screen
(B)
.
Screw the hexagon nut
(C)
down
to fix the eye bolt.
Mount the electrical spindle
(D)
in place of the mechanical
adjustment.
Adjust the holder
(E)
on the
electrical spindle.
The spiral hose fixed by the
two fastening clips
(F)
must be
able to move easily.
Lay cable with switch box
(G)
to the operator's position in
the tractor.
Connect the 3-pin plug
(H)
to
the socket on the tractor.
If your tractor is not fitted
with a socket, contact your
dealer or have a socket
installed by a specialist
technician.
The parts
(J)
for installing the
correct socket are included
with the equipment supplied.