WIKA operating instructions, model F1201
EN
14505091.01 08/2021 EN/DE
12
5. Commissioning, operation
5. Commissioning, operation
5.1 Precautions before commissioning
■
Compression force transducers are sensitive measuring instruments and must be
handled with appropriate care.
■
With the commissioning of compression force transducers, make sure they are on a
level, clean and grease-free contact surface.
■
The contact surface should have a hardness of at least HRC 50, be ground or lapped
and have a roughness of Rz 4 and flatness of 0.02 mm. It must not bend under load.
5.2 Mounting instructions
CAUTION!
Damage to the instrument through improper commissioning
■
Torsional moments, eccentric loads and transverse loads or lateral forces cause
measuring errors and may permanently damage the compression force transducer.
■
Incorrect loading can lead to permanent damage resulting in a zero point offset in the
unloaded state.
▶
The force introduction must always be applied centrally to the crowned surface of the
compression force transducer.
▶
Torsional and transverse forces must be avoided. Transverse loads and lateral forces
also include the corresponding components of the measurands that are introduced
slanted.
▶
During installation of the compression force transducer, the output signal (force
value) must always be monitored to avoid mechanical overloading.
▶
The compression force transducer should only be loaded in the intended position.
▶
An overload must be excluded at all times.
▶
The rated temperature range must be observed. Temperature-related measured
errors must be excluded.