Section 2
Step 2
– Install Patio Blocks
23
2.1 Mark exact pool radius using the center stake.
Using the chart below, in accordance with the pool
footprints (Page 42-49), mark the locations of each patio
block.
Break patio block into two halves to allow rebar to later
be installed through the anchor plate (Figure 2.2). Sink
the patio blocks flush with the ground at each marked
location
.
All patio blocks
must be
flush and level with
each other in all directions. Confirm with a straight 2x4
and level placed between blocks or by using a transit
Panel joints will be located over each patio block. Place
an anchor plate (#77004) on top of each patio block.
Pool Size
16'
18'
21'
24'
27'
30'
Patio Block
Spacing
73-1/2" 82-5/8"
77-7/8"
89"
100-1/8" 93-3/16"
Reference
Angle
Between
Markings
45 Deg
45 Deg
36 Deg
36 Deg
36 Deg
30 Deg
3.1
2.2
2.1
16FT POOL SHOWN
Section 2
FULLY IN-GROUND WITH POLYMER STEP
FULLY IN-GROUND STEP
Summary of Contents for Optimum Pool Round 95-0770
Page 1: ...09 2021...
Page 2: ......
Page 44: ...42 POOL FOOTPRINTS...
Page 45: ...43 POOL FOOTPRINTS...
Page 46: ...44 POOL FOOTPRINTS...
Page 47: ...Section 2 45 POOL FOOTPRINTS...
Page 48: ...46 POOL FOOTPRINTS...
Page 49: ...47 POOL FOOTPRINTS...
Page 50: ...48 POOL FOOTPRINTS...
Page 51: ...49 POOL FOOTPRINTS...