6
Installation Procedure
Wheel
(HWM1320)
3/8" x 2-3/4" bolt
(HWB38X275GR5)
3/8" Nylock Nut
(HWN38L)
Plastic Washers
(HWM1480)
Clevis Pin
(HWM1100)
Clevis Pin
(HWM1100)
Top Rail w/Handle
(SP0124)
Cotter Pin
(HWM1130)
Plastic Washers
(HWM1480)
Bottom Rail
(SP0125)
Cotter Pin
(HWM1130)
6. Assemble wheel onto rolling end post
with 3/8" bolt, washers and nut.
NOTE:
It may be advantageous to have a
second person help with the following.
7. Slide top and bottom rails into post and
secure with clevis pins. Plastic washers
are used between the rails and the post
(both sides of tubes).
NOTE:
The bottom rail with spring
attachment bracket must be oriented as
shown below. It should be a mirror image
of the bottom rail at the other end.
Washers
(HWW38FL)