Section 3
Operation
This section describes the operation of the system.
3.1 Pre-Operation Check
Before operating the system:
•
Be sure to read and understand the entire operation procedure before beginning
operation.
•
Visually inspect the system for damage. If damage is apparent, do not use the system,
and have it serviced prior to use.
•
Read and understand the controller manual. Ensure that all warnings, associated with
the controller are understood and followed. Ensure all relevant installation, operation,
and maintenance instructions are followed.
•
Ensure that the area around the pan and tilt area is clear so no damage will result from
unexpected movement.
•
Ensure that all wiring connections are tight and appropriately connected.
•
Ensure that the following warnings are understood and followed:
Tip Over Hazard!
Do not operate in high winds. Operate on level ground only. Stand clear of
positioner and payload during operation. Be certain positioner is level and secure. System tip
over could result in death or serious injury.
Safety Instruction
– Operation!
For outdoor use only. Do not use in areas that have been
classified as hazardous as defined in Article 500 of the National Electric Code.
Safety Instruction
– Keep Clear!
Keep personnel clear of the positioner during operation.
Equipment Damage!
Check for and remove any objects which might obstruct motion, cause
binding, or hinder function of the system. Hitting obstructions will cause damage to the
positioner.
Equipment Damage!
If the electronic tilt limit stops are reset to their original settings, it is
possible to drive the payload platform into contact with the positioner. Damage to the positioner
and payload will occur.
Summary of Contents for 5061001
Page 2: ......
Page 8: ...POSITIONIT PI 150 AND PI 75 vi TP 5129001 J January 2022 ...
Page 34: ...POSITIONIT PI 150 AND PI 75 2 14 TP 5129001 J January 2022 ...
Page 44: ...POSITIONIT PI 150 AND PI 75 4 2 TP 5129001 J January 2022 ...
Page 50: ...POSITIONIT PI 150 AND PI 75 5 6 TP 5129001 J January 2022 ...
Page 56: ...POSITIONIT PI 150 AND PI 75 7 2 TP 5129001 J January 2022 ...
Page 57: ...POSITIONIT PI 150 AND PI 75 TP 5129001 J 7 1 January 2022 ...
Page 59: ...POSITIONIT PI 150 AND PI 75 TP 5129001 J 7 3 January 2022 ...
Page 61: ...POSITIONIT PI 150 AND PI 75 TP 5129001 J 7 5 January 2022 ...
Page 63: ...POSITIONIT PI 150 AND PI 75 TP 5129001 J 7 7 January 2022 ...
Page 65: ...POSITIONIT PI 150 AND PI 75 TP 5129001 J 7 9 January 2022 ...
Page 67: ...POSITIONIT PI 150 AND PI 75 TP 5129001 J 7 11 January 2022 ...