2
3
1
EZ RAZE Top Tube
Tube Sections
Base Tube
Deploying the Mast
1.
Locate the base tube and keep separate from the other
mast tubes.
The AM2 has three different tubes:
2.
Retrieve the EZ RAZE top tube and tube section and
insert the tube section from the bottom of the tripod with
the locating notches toward the ground. Take note of
small dimple in one of the locating notches on the bottom
of the mast tube. Orient this dimple toward you during
deployment of the mast.
3.
Lift the tube until there is one hand width from the
bottom of the tube and tighten the clamp.
4.
To install the EZ RAZE system, open up the restrain
system by engaging the kick stand lever to the lower bar.
Then, slide the EZ RAZE carriage over the top of the tube
section until resting on the top of the tripod.
4
Do not duplicate, alter, or copy without the written consent of The Will-Burt Company. © Copyright 2013 The Will-Burt Company
11
www.antennamast.com