PLB-112
Oil Furnaces
–
Furnace Manual
11/13
15
4. CHECKOUT PROCEDURE (continued)
Installation and service certificate
Furnace model _________________________________ Series _________________________________
Serial number __________________________________ Date installed ___________________________
Installation instructions have been followed.
Checkout sequence has been performed.
Above information is certified to be correct.
Information received and left with owner/maintenance person.
Installer ______________________ ________________________ ____________________
(Company) (Address)
(Phone)