5
BREWING INSTRUCTIONS
12.
Remove any pressure in the vessel by pressing
the button on the VPRV. Remove lid, sediment
bottle and drain BrewKeg10
TM
.
13.
Rinse sediment bottle in cold water thoroughly.
14.
Rinse lid in cold water and place upside down
on bench.
15.
Open butterfly valve and rinse out BrewKeg10
TM
again to remove all the detergent residue.
16.
Close butterfly valve.
17.
Fill BrewKeg10
TM
with 4L (1 gal.) of boiling water.
18.
Install lid with silicon seal properly and shake
upright, inverted and on its side for at least
10
seconds.
19.
Connect CO
2
briefly to pressurise if required
before connecting beer tap lines to flush
with remaining boiling water from inside the
BrewKeg10
TM
. (Run through beer lines until it
runs hot).
20.
Remove any pressure in the vessel by pressing
the button on the VPRV.
21.
Remove lid and place upside down on bench
before draining the BrewKeg10
TM
.
Fig 2: Assembled BrewKeg
TM
Lid
BEVERAGE-OUT PORT
(WITHOUT NOTCHES
ON ITS BASE HEX, WITH
TUBE EXTENDING INTO
THE VESSEL)
BREWKEG
TM
LID.
GAS-IN PORT
(WITH NOTCHES
ON ITS BASE HEX)
‘L’ IS FOR LIQUID OUT.
THE BLACK DISCONNECT
CONNECTS TO IT
‘G’ IS FOR GAS IN.
THE GREY DISCONNECT
CONNECTS TO IT
VARIABLE PRESSURE
RELIEF VALVE (VPRV)
Summary of Contents for BrewKeg10
Page 2: ...VERSION 01...
Page 17: ...1 1 BREWING INSTRUCTIONS NOTES...
Page 18: ...1 1 USER GUIDE NOTES...
Page 19: ...1 1 BREWING INSTRUCTIONS NOTES...
Page 20: ......