Page 3
Rev. 10/2016
www.willoughby-ind.com
Installation & Operation Manual
Outdoor Pet Drinking Fountain
WODF-1-PET Series
Willoughby Industries, Inc.
TOLL FREE
(800) 428-4065
●
LOCAL
(317) 875-0830
●
FAX
(317) 875-0837
Pre-Installation Information
When installing the
Willoughby Industries' WODF-1-PET Series
fountain system:
Before Step 1 of the installation instructions, ensure that rough-ins are in the correct location.
The valve assembly, including the spray head,
MUST NOT BE
connected until
after
all lines have
been fl ushed to remove the small particles of debris that are inherent with new construction projects
and all chemicals that are used in fl ushing are purged from the system.
Chemicals used in fl ushing plumbing systems can attack the internal components of the valve and
spray head and severely damage them, so any fl ushing of the system must be followed by a full
fl ushing with pure water to clear any harsh chemicals remaining in the system. Debris in the system if
allowed to enter the valve assembly and spray head can cause poor performance or outright failure.
Again
DO NOT
attempt to connect the valve assembly and spray head until
after
all fl ushing is
complete and pure water is the only media that will be passing through the system. Damage to the
valve assembly or spray head caused by harsh chemicals or debris will not be covered by the
manufacturer's warranty.
Any fi ttings provided by the installer should be made of plastic to electrically isolate the unit from the
building or connected plumbing system.
The grounding of electric equipment such as telephones, computers, etc, to water lines is a common
procedure. This grounding can cause electrical feedback into a water fountain or similar fi xture,
causing electrolysis, which results in a metallic taste or an increase in the metal content of the water.
This can easily be avoided by using the proper materials as indicated.
Installation notice!
Check Rough-In location
PRIOR
to installation
Flush lines thoroughly
PRIOR
to hook-up
Installation notice!
Check Rough-In location
PRIOR
to installation
Flush lines thoroughly
PRIOR
to hook-up