2
OPM-160/A
TABLE OF CONTENTS
SAVE THESE INSTRUCTIONS
3
SAFETY INFORMATION
4
SAFETY DEFINITIONS
CALIFORNIA PROPOSITION 65
SPECIFICATIONS 5
PSS60F4
INTRODUCTION 6
TESTING POLICY
PRODUCT DESCRIPTION
PREPARING THE UNIT
7
START-UP CHECK LIST
UNPACKING
INSTALLATION 8
ENGINE-GENERATOR SET MOUNTING
FUEL INSTALLATION
8
INSTALLING THE FUEL LINE
LIQUID PROPANE VAPOR (LP)
NATURAL GAS (NG)
FUEL PRESSURE
NG/LP FUEL CONVERSION
INSTALLING THE BATTERY
11
SERVICING BATTERIES
BATTERY CHARGING
BATTERY CHARGER & BLOCK HEATER
GROUNDING
MOUNTING THE ATS
AC ELECTRICAL CONNECTIONS
13
DC ELECTRICAL INTERCONNECTION 15
ASCO 185 UL SWITCH
ASCO 300 UL SWITCH
STARTING PROCEDURE
16
PRE-START CHECK LIST
VOLTAGE REGULATOR
18
AUTOMATIC TRANSFER SWITCH
ENGINE-GENERATOR SET
COLD WEATHER OPERATION
PREVENTATIVE MAINTENANCE
19
MAINTENANCE SCHEDULE
TROUBLESHOOTING TABLES
20
AC WIRING
21
ENGINE HARNESS SCHEMATIC
22
DSE 7310 MKII WIRING DIAGRAM
23
LIMITED WARRANTY
24