Inst
allation
support frame into slots on Ceiling Plate); secure support
7) Lift hood and fasten to ceiling Plate (lock tabs on
frame to Ceiling Plate with screws provided.
12
10) Inside the blower unit, remove shipping block from blower assemly
blower unit).
(slide duct covers up to gain access to the top of the
8) Connect duct work and electrical to the blower unit
prior to use of appliance.
9) Slide up the top duct cover, and fix it onto bracket with 4 screws.
12
Summary of Contents for PFA36SCG
Page 1: ...OCT06 0101 PFA42SCG PFA36SCG www windcrestcnp com By CNP INDUSTRIES INC ...
Page 2: ......
Page 59: ......
Page 60: ......