15
2.
For the Installer
c) with eyelet and crane (not included in scope of delivery)
Screw eyelet M12 for the crane hook to the screw connection of the threaded bolt on the coasting surface lid
and lift the boiler off the pallet with the crane.
Fig. 15 Mount the eyelet (not included in
scope of delivery) for the crane hook
Fig. 16 Lift the boiler off the pallet
2.4.3 Installation
(observe minimum clearances! – section 2.4.4)
The boiler can be installed directly on a fire-resistant surface and does not require a special foundation.
2.4.3.1 Installation flush to wall: top flue connection
The boiler can be installed flush to the wall. Before installation, the rear panel has to be removed. You also have
to cut into the insulation and seal the supply and return connections – Fig. 17.
Note!
Care must be taken with regard to wall-flush installation to ensure that the piping is sealed com-
pletely before actually installing the boiler (f necessary test under pressure by previously moun-
ting the filling and evacuation cock – see section 2.4.5).
Hydraulic adapter 1“
See separate, provided instructions „Installing the Hydraulic Adapter 1“ BIO 062“.
Fig. 17 Connection options for heating feed/return line – view from behind without rear panel