13
2.
Operation
2.4 Check before inital start-up
a)
System pressure (heating water pressure):
The system must be filled and vented. When the system is cold,
the pressure should be at least 1.0 bar (maximum 1.8 bar). If you have any questions, your installer will gladly
answer them.
b)
Ventilation:
Ensure that the boiler room is well ventilated. The air supply must be as free of dust as possible.
c)
Flue:
Please have the chimney sweep check the flue regularly, and clean it, if necessary.
d)
Barriers:
Check that the barriers installed in the heating system are set correctly.
e)
Accumulator tank:
If the temperature shown on the central thermometer is already 70°C, do not continue
heating or replenish any fuel!
f)
Thermal process safeguard:
Check discharge funnel. Outflow must not drip.
g)
Water tank:
For level check in water tank for burn-back safeguard – see section 3.4.5.
2.5 Filling the integral fuel hopper
2.5.1 Manual filling
Open integral fuel hopper cover and fill hopper up to max. 1 cm below the edge. Close the cover.
2.5.2 Fully automatic filling
The integral fuel hopper is filled by the fully automatic pellet feed. Windhager Customer Service or the customer
service partner will fill the hopper for the first time during commissioning, and will start the boiler and familiarise
the customer with the operation and cleaning of the boiler, using the operating manual for reference.