21
2.
For the Installer
2.4.4 Note before installation
Confirm hydraulic piping:
– Windhager hydraulic piping DUO 001 is used, or
– Hydraulic piping is completely installed on-site
Confirm flue gas connection:
– Windhager flue gas connection set DUO 002 is used, or
– Flue gas connection is completely installed on-site; see also point 2.4.5.
2.4.5 Wood gasification boiler: Installing the flue connection adapter
– Only for wood gasification boiler with flue connection adapter (accessories)
Standard installation of blower housing is directly on the boiler – Fig. 20
è
flue connection at top.
With the adapter (accessories), the blower housing is located outside of the cladding – Fig. 23. The flue
connection is steplessly adjustable from left to right – Fig. 22.
– Unscrew 4 interior nuts in the blower housing (Fig. 20) and remove the housing. Do not remove the seal –
Fig. 21.
Fig. 20 Blower housing directly on boiler –
standard
Fig. 21 Seal on boiler
Note!
If the wood gasification boiler LogWIN Klassik pellets ready is already installed, continue with sec-
tion 2.4.27.
Summary of Contents for DuoWIN
Page 15: ...15 2 For the Installer ...
Page 69: ...69 5 Technical Data ...