background image

Enterprise Gateway 

Doc No. A3930_UM Rev 2 

 

Table of Contents 

1  A3930 Windrock Spotlight Gateway ..................................................................................................... 4 

1.1 

Connections .................................................................................................................................. 4 

1.2 

Indicators ...................................................................................................................................... 4 

1.3 

Operation ...................................................................................................................................... 5 

2  Included Accessories ............................................................................................................................. 5 

2.1 

General .......................................................................................................................................... 5 

2.2 

Gateway WiFi Antennas ................................................................................................................ 5 

2.3 

Gateway LTE Antennas ................................................................................................................. 6 

3  System Installation ................................................................................................................................ 6 

3.1 

General .......................................................................................................................................... 6 

3.2 

Hazardous Locations ..................................................................................................................... 6 

3.3 

On-site Assembly .......................................................................................................................... 6 

3.4 

Installation Overview .................................................................................................................... 7 

3.5 

Gateway Mounting ....................................................................................................................... 8 

3.6 

Gateway Power Requirements ..................................................................................................... 8 

3.7 

Environment.................................................................................................................................. 9 

4  Maintenance and Cleaning ................................................................................................................... 9 
5  Specifications ........................................................................................................................................ 9 
6  Appendix. ............................................................................................................................................ 10 

6.1 

Gateway Mounting Options ........................................................................................................ 11 

6.2 

Gateway Control Drawing ........................................................................................................... 12 

 

IMPORTANT: POWER REQUIREMENTS.  If voltage and power requirements are not 
met, system integrity will be compromised.  Review power requirements and 
warnings as laid forth in this document.  For additional details, refer to the Spotlight 
Datasheet. 

PRESSURE WASH WARNING.  Use of harsh cleaning chemicals, solvents, and degreasers may impare the 
functionality of the system.  When pressure washing, be cautious on length of time and intensity of spray on all 
parts of the system, including sensors and cabling.  If parts of a Spotlight system were removed in order to 
perform cleaning and/or maintenance, contact Windrock Product Support at 865-330-1100 and ask for 
Spotlight Installation Support to verify operation. 

Summary of Contents for Enterprise A3930

Page 1: ...User Manual Enterprise Gateway...

Page 2: ...r use of this material Information in this document is subject to change without notice and does not represent a commitment on the part of Windrock Incorporated Any software described in this document...

Page 3: ...6 2 Gateway Control Drawing 12 IMPORTANT POWER REQUIREMENTS If voltage and power requirements are not met system integrity will be compromised Review power requirements and warnings as laid forth in t...

Page 4: ...with the possibility to use an Ethernet based local network connection instead Other models are restricted to an Ethernet connection and do have have cellular service configured at all 4G LTE Antenna...

Page 5: ...ce Contact your sales representative or Windrock directly AVERTISSEMENT Si A3930 ne fonctionne pas correctement puis doit tre renvoy Windrock des r parations Contactez votre repr sentant commercial ou...

Page 6: ...ce Contacter votre vendeur Windrock ou Windrock service client le pour toute question concernant l installation 3 2 Hazardous Locations THIS EQUIPMENT IS SUITABLE FOR USE IN CLASS 1 DIVISION 2 GROUPS...

Page 7: ...by customer 6 Customer must provide supply voltage at desired mounting location For details see Section 3 6 and the Spotlight Datasheet Ensure power is de energized 7 Install disconnecting device clea...

Page 8: ...ing bars that accept 10 32 screws Windrock recommends using this mounting method Attach the mounting bars to the enclosure using the flathead screws included with the plastic mounting feet Option 2 Fi...

Page 9: ...and Cleaning The Windrock Spotlight contains no user serviceable parts and requires no routine maintenance Repair and support are provided by Windrock Inc only Firmware and software updates are availa...

Page 10: ......

Page 11: ......

Reviews: