4.  Now that the frame of the rack is assembled, insert the first long middle into the frame of the rack with the
  notches facing upward. (figure 3)

5. 

Insert the second long middle into the frame. The long middle pieces will join at the middle notch and slide down

  into place. (figure 4)

BOTTOM

OF RACK

BOTTOM

OF RACK

NOTCHES

    TIP: DO NOT FORCE! Carefully work the shelves into the frame by hand until they settle flush with the sides.

  If necessary, use a rubber mallet to lightly tap the shelf pieces into place.

3

INSERT FIRST
LONG MIDDLE

4

INSERT SECOND
LONG MIDDLE

BOTTOM

OF RACK

BOTTOM

OF RACK

6.  Insert the first two small middle pieces into the frame.  The notches on the small middle pieces will interlock
  with the notches on the long middle piece and slide down into place. (figure 5)

  Flip rack over and repeat step 6 for the final two small middle pieces. (figure 6)

5

INSERT FIRST
SMALL MIDDLE

6

INSERT SECOND
SMALL MIDDLE

Summary of Contents for Solid Diamond Cube

Page 1: ...ntain the following Package Contents tools for assembly Page 1 or visit wineracksamerica com Questions 888 373 6057 Required Suggested Screwdriver Side Panel Top Panel Bottom Panel WOOD SCREWS FINISH NAILS Trim Piece Long Middle Short Middle 34 7 8 34 7 8 TOP PANEL x1 47 1 4 47 1 4 LONG MIDDLE x2 BOTTOM PANEL x1 33 7 8 33 7 8 TRIM PIECE x1 34 7 8 SIDE PANEL x2 35 5 16 SMALL MIDDLE x4 23 5 8 SHIM x...

Page 2: ...t to verify package contents 1 ATTACH SIDES TO BOTTOM 2 Using the provided wood screws attach the bottom panel into the grooves of the two side panels figure 1 3 Attach the top panel to the side panel pieces using the wood srews provided Make sure to keep the side panels and top panel held tightly together when securing It may be easier to stand the rack upright when securing the top frame piece f...

Page 3: ... NOTCHES TIP DO NOT FORCE Carefully work the shelves into the frame by hand until they settle flush with the sides If necessary use a rubber mallet to lightly tap the shelf pieces into place 3 INSERT FIRST LONG MIDDLE 4 INSERT SECOND LONG MIDDLE BOTTOM OF RACK BOTTOM OF RACK 6 Insert the first two small middle pieces into the frame The notches on the small middle pieces will interlock with the not...

Page 4: ...into each hole and wipe excess putty off the surface using a damp cloth 7 ATTACH BOTTOM TRIM PIECE 9 If you purchased a solid top secure it by placing a small amount of wood glue on the top of the box frame Clamp the top to the frame using standard wood clamps until fully dry figure 9 8 To prevent the bottom of the rack from bowing under the weight of your bottles slide the bottom frame shim under...

Reviews: