•
The inert valve in the FGSS closes again after 25 seconds, when the pipes are filled with
inert gas.
•
If the inerting sequence was successful, the iGPR control system activates the inerting
completed signal from iGPR to PCS.
•
If the inerting sequence was not successful, the iGPR control system activates the inerting
failed signal from iGPR to PCS.
6.3.6
Engine maintenance
If you have to do maintenance on the engine or on the iGPR or on the supply line, you have to
start the related maintenance mode, refer to section
8.20 Prepare the engine for standstill or for
Then the iGPR control system automatically starts the inerting sequence, refer to
X72-B
AA00-8904-00AAA-043A-A
Operation Manual
Integrated gas pressure regulation
Winterthur Gas & Diesel Ltd.
- 239 -
Issue 003 2021-12