8.19
Prepare the engine for a short service break
Periodicity
Description
Unscheduled
Duration for performing preliminary requirements
0.0 man-hours
Duration for performing the procedure
0.5 man-hours
Duration for performing the requirements after job completion
0.0 man-hours
Personnel
Description
Specialization
QTY
Engine crew
Intermediate
1
Support equipment
Description
Part No.
CSN
QTY
None
Supplies
Description
QTY
None
Spare Parts
Description
Part No.
CSN
QTY
None
SAFETY PRECAUTIONS
•
None
PRELIMINARY OPERATIONS
•
The engine must be stopped. Refer to section
8.18 Prepare the engine after stop - general
X72-B
AA00-0000-00AAA-151A-A
Operation Manual
Prepare the engine for a short service break
Winterthur Gas & Diesel Ltd.
- 352 -
Issue 003 2021-12