9.4
Clean the turbocharger during operation
Periodicity
Description
Weeks
1
Duration for performing preliminary requirements
0.0 man-hours
Duration for performing the procedure
1.0 man-hours
Duration for performing the requirements after job completion
0.0 man-hours
Personnel
Description
Specialization
QTY
Engine crew
Intermediate
1
Support equipment
Description
Part No.
CSN
QTY
None
Supplies
Description
QTY
Cleaning fluid
A/R
Spare Parts
Description
Part No.
CSN
QTY
None
SAFETY PRECAUTIONS
CAUTION
Damage Hazard: For an engine with LP SCR system, do not do this procedure, if there is
gas flow through the LP SCR reactor. This could cause damage to the components of the
SCR system.
PRELIMINARY OPERATIONS
•
None
X72-B
AA00-6500-00AAA-200A-A
Operation Manual
Clean the turbocharger during operation
Winterthur Gas & Diesel Ltd.
- 372 -
Issue 003 2021-12