10.18
Temporary isolate the HP SCR system
Periodicity
Description
Unscheduled
Duration for performing preliminary requirements
0.0 man-hours
Duration for performing the procedure
4.0 man-hours
Duration for performing the requirements after job completion
0.0 man-hours
Personnel
Description
Specialization
QTY
Engine crew
Intermediate
1
Support equipment
Description
Part No.
CSN
QTY
Cover
2
Supplies
Description
QTY
None
Spare Parts
Description
Part No.
CSN
QTY
None
SAFETY PRECAUTIONS
PRELIMINARY OPERATIONS
•
The engine must be stopped and prepared for maintenance, refer to section
the engine after stop - general
X72-B
AA00-9270-00AAA-720C-A
Operation Manual
Temporary isolate the HP SCR system
Winterthur Gas & Diesel Ltd.
- 454 -
Issue 003 2021-12