PRE-INSTALLATION
On arrival of the equipment it is advisable to check that all packages listed on the
consignment note have been received.
The equipment must be offloaded using certified lifting gear of suitable capacity,
by a competent person.
An outline drawing and bolt hold plan is normally sent prior to the despatch of
the machine and will enable preparations to be made for the installation. With the
`picture` of what the machine will look like when it is assembled, the ancillary
equipment dismantled for transport can easily be identified.
Summary of Contents for Croker CUMFLOW RP100XD
Page 4: ...OPERATING AND MAINTENANCE MANUAL SECTION 1 GENERAL INFORMATION RP100XD...
Page 11: ...INSTALLATION DRAWING...
Page 12: ...OPERATING AND MAINTENANCE MANUAL SECTION 2 INSTALLATION AND OPERATING INSTRUCTIONS...
Page 19: ...OPERATING AND MAINTENANCE MANUAL SECTION 3 TECHNICAL SPECIFICATION AND MAINTENANCE...
Page 25: ...LUBRICATION CHART...
Page 26: ...OPERATING AND MAINTENANCE MANUAL SECTION 4 MIXER SPARE PARTS...
Page 27: ...RP100XD MIXING PAN DRIVE...
Page 30: ...RP100XD STAR DRIVE ASSEMBLY...
Page 32: ...RP100XD MIXING STAR ASSEMBLY...
Page 34: ...RP100XD MIXING STAR LIFTING ARRANGEMENT...
Page 36: ...RP100XD COVERS GUARDS...
Page 44: ...OPERATING AND MAINTENANCE MANUAL SECTION 5 ANCILLARY EQUIPMENT SPARE PARTS...
Page 45: ...RP100XD PAN TROLLEY...
Page 47: ...PAGE INTENTIONALLY BLANK...
Page 50: ...OPERATING AND MAINTENANCE MANUAL SECTION 6 ELECTRICAL SYSTEM...
Page 51: ...CONTROL BOX WIRING LAYOUT...
Page 52: ......
Page 53: ......
Page 54: ......
Page 55: ......
Page 56: ......
Page 57: ......
Page 58: ...OPERATING AND MAINTENANCE MANUAL SECTION 7 MISCELLANEOUS...