ball bearing
retainer
16
MAIN DESK
RETURN DESK
15
Chart 8
Step 15. Insert the two Grommets on top of the Main Desk and Return Desk.
Step 16.
Install the drop front center drawer (C) and keyboard pullout (L) to place.
Important:
(Be sure to move the ball bearing retainer all the way to the front of the glide
and carefully slide the rails into the glides and ball bearing retainer.)
Assembly is now complete
C
L
13
Chart 7
Step 12. Place R1 desk top (B) and R2 desk top (J) over the bases. Connect RHS glide panel
(D) to R1desk top (B) by inserting (1-1/4") machine bolts (3 PCS), but do not fully
tighten. Align both tops to each other and fully tighten previously inserted (1-1/4")
machine bolts (3 PCS). Use (1-1/4") flat head wood screws (2pcs) to reinforce the
assembly.
Step 13. Insert
short (1") flat head wood screws
(22 PCS) through metal figure 8 to
connect R1 desk top (B) to Main Desk base and R2 desk top (J) to Return Desk base.
Step 14. Use
long(1-1/4")flat head wood screws
(2 PCS)
to connect Cross Bar (H) to
R1 desk top (B).
13
14
X2
H
B
J
D
12
1-1/4"
X3
12
X2