10.11
Disconnent the fuel pump
Periodicity
Description
Unscheduled
Duration for performing Preliminary requirements
0.0 man-hours
Duration for performing the Procedure
1.0 man-hours
Duration for performing the Requirements after job completion
0.0 man-hours
Personnel
Description
Specialization
QTY
Engine crew
Basic
1
Support equipment
Description
Part No.
CSN
QTY
Flange
94569
pc 1
Flange
94569A
pc 1
Roller lifting tool
94430
pc 1
Claw
94430A
pc 1
Screw
94430B
pc 1
Supplies
Description
QTY
None
Spare Parts
Description
Part No.
CSN
QTY
None
SAFETY PRECAUTIONS
•
None
PRELIMINARY OPERATIONS
•
The engine must be stopped and prepared for maintenance, refer to
X52
AA00-5556-00AAA-510B-A
Operation Manual
Disconnent the fuel pump
Winterthur Gas & Diesel Ltd.
- 394 -
Issue 002 2018-11