8.13
Change-over from MDO to HFO manually
Periodicity
Description
Unscheduled
Duration for performing Preliminary requirements
0.0 man-hours
Duration for performing the Procedure
2.0 man-hours
Duration for performing the Requirements after job completion
0.0 man-hours
Personnel
Description
Specialization
QTY
Engine crew
Intermediate
1
Support equipment
Description
Part No.
CSN
QTY
None
Supplies
Description
QTY
None
Spare Parts
Description
Part No.
CSN
QTY
None
SAFETY PRECAUTIONS
•
None
PRELIMINARY OPERATIONS
•
WinGD recommends to do a manual change-over only, if an automatic change-over system
is not installed or if the automatic change-over system is unserviceable.
X52
AA00-0000-00AAA-131H-A
Operation Manual
Change-over from MDO to HFO manually
Winterthur Gas & Diesel Ltd.
- 312 -
Issue 002 2018-11