10.10
Temporary isolate a cylinder with cooling water leakage
Periodicity
Description
Unscheduled
Duration for performing Preliminary requirements
0.0 man-hours
Duration for performing the Procedure
1.0 man-hours
Duration for performing the Requirements after job completion
0.0 man-hours
Personnel
Description
Specialization
QTY
Engine crew
Basic
1
Support equipment
Description
Part No.
CSN
QTY
Pressure element
94259
A/R
Supplies
Description
QTY
None
Spare Parts
Description
Part No.
CSN
QTY
None
SAFETY PRECAUTIONS
•
None
PRELIMINARY OPERATIONS
•
The engine must be stopped and prepared for maintenance, refer to
X52
AA00-0000-00AAA-662B-A
Operation Manual
Temporary isolate a cylinder with cooling water leakage
Winterthur Gas & Diesel Ltd.
- 390 -
Issue 002 2018-11