5. Point-to-Multipoint Backhaul
Final Communication Test
3
Wait 2 minutes to confirm that RECORDER_B completes its boot cycle.
4
Disconnect RECORDER_A.
5
Verify that all line station radios are listed in the Discovery window through RECORDER_B
within 2 minutes. The typical switch over takes 30 seconds but it can take longer.
6
Supply power to RECORDER_A and disconnect power from RECORDER_B.
7
Verify that all line station radios are listed in the Discovery window through
RECORDER_A.
8
Supply power to RECORDER_B.
9
Verify that all line station radios are listed in the Discovery window.
10 Verify that both recorder radios are listed in the Discovery window.
5.4.3 Using a Custom Configuration
Custom configurations may have a number of recorder radios and line station radios.
Correctly configure the backhaul for one of the recorders, for example, RECORDER_A, as
detailed in “Using one Recorder Radio” on page 117.
Then, configure the backhaul for each additional recorder, for example, RECORDER_B, until
the backhaul configuration is complete.
5.5 Final Communication Test
This section describes how to run the final speed test to verify good communication
throughout the backhaul. The final communication test should be run from each recorder
radio that will be communicating to line radios during production.
NOTE
Remove power from competing recorder radios during the configuration process.
During production is the only time more than one recorder radio should have
power applied.