60
RT System 2 v2.3 Deployment Guide
R01.i
© 2010-2014 Wireless Seismic, Inc. All rights reserved.
3. Backhaul
Setting up the Backhaul
Ɣ
NanoStation radio installation:
Ź
Open the surge protector case [R-9].
Ź
Remove the grommet from the case.
Ź
Thread the Ethernet cable [RN-3],
through the grommet with the short
Ethernet cable (that is attached to the
redound the ground wire [BK-14]. Place
the grommet back in the case.
Ź
Plug the Ethernet cable into the shielded
RJ45 jacks. It does not matter which
cable goes to which jack; the unit
provides bidirectional protection.
Ź
Close the surge protector case.
Ź
Attache the strain relief [RN-4] to the D-
ring on the bracket.
Ź
Loop the Ethernet Cable [RN-3] through
the strain relief [RN-4].
12 Attach the guy lines to the mast collar.
NOTE: Use a taut-line-hitch knot for best results (see
“G. Rope Knot” on page 188).
Table 3–10 How to Set Up the Backhaul
Step
Image