2
Safety
12
Translation of the original operation manual
•303_208176_1004_en•ski
Check list for inspecting the protection features when the unit is in a depressur-
ized state
➤
Inspect the safety valve leading or seal for damage.
➤
Inspect the safety valve for visible damage.
➤
Inspect the grounding cable for damage.
➤
Inspect the grounding cable’s connection to the unit and to the conduct.
➤
Inspect the compressed air tap lock for perfect functioning.
➤
Inspect the functioning of the spraying gun’s safety lever.
➤
Check the STOP-key for correct function.
➤
Inspect rupture disks for damage.
If a protective device is not fully operative, or another defect is detected on the
machine, shut down the unit immediately.
The unit only have to be used if all components are fully functional.
2.5
Handling of the machine and auxiliary material
Alignment, servicing, maintenance and repair of the machine
Activity
Personnel Qualification
Adjusting work
trained operator
Servicing work
trained operator
Cleaning work
trained operator
Maintenance work
personnel trained by
customer service
Repair work
personnel trained by
customer service
➤
Before starting work, the compressed air supply of the machine must be shut-off
(picture 2.7).
➤
Make sure that no residual pressure remains on the compressed air side or on the
material side.
➤
In any case, the function of all protective devices, as well as perfect function of the
machine, must be checked after completion of the work.
Handling of auxiliary materials
When handling auxiliary materials such as paint, solvents, oils, grease and other chemi-
cal substances, comply with the safety and dosing instructions of the manufacturer and
the generally applicable regulations.
Left over solvents, oils, grease and other chemical substances must be collected accord-
ing to the legal regulations for recycling and waste disposal.
The local official laws for the protection of waste water must be observed.