6
Operation
36
Translation of the original operation manual
•303_208176_1004_en•ski
Settings on the mixer (circulate)
➤
Turn lever on the external mixer:
➤
SPRAY lever (pos. 13.2) to “CLOSED”.
➤
FLUSH (pos. 13.3 A / B) to “CLOSED”.
➤
CIRCULATE (pos. 13.1) to “OPEN”.
➤
Circulate until the indicators (black) on the contact gauge (pos. 3) are at 0 bar.
➤
Trigger gun shortly to pressure release the equipment.
Lock the safety catch on the spray gun* afterwards.
When making a PAUSE AT WORK:
➤
Set a low inbound air pressure (Pos. 2.2) of the main pump.
➤
Set a low inbound air pressure (pos. 10.1) on the feed pumps.
The pump should cycle slowly and allow the material in the lines to circulate.
Please make sure that you do not leave the machine unattended! You must be
able to react quickly in a case of emergency!
Depending on the composition of the material being processed and the duration of the
pause it may be wise to stop the work on the machine completely and start it later again
(see chapter “Job commencement”). Please refer to the material manufactories data/
recommendations.
If you prefer this, please follow the steps in “Job finishing”.
When doing a JOB FINISHING:
Turning off equipment for processing the material
Even if equipment for heating up the material is turned off it may still be hot on the sur-
face.
Always wear protective gloves if you have to handle this equipment.
➤
Fluid Heater (pos. 11):
➤
Turn off the equipment by lowering the temperature on the adjusting knob.
➤
Disconnect it from the power connection. (Please take at notice that the device is
still active even with the temperature turned down due to the integrated protection
against freezing! To completely turn the device off, you
MUST
disconnect it from
the power connection.
CAUTION!
When shutting down the
system, ensure that no
pressure remains in the
system!