Operation
6
Translation of the original operation manual
37
37
•303_208176_1004_en•ski
➤
Immension heater (pos. 12):
➤
Turn off the equipment by lowering the temperature on the adjusting knob. and
disconnect it from the power connection.
➤
Agitator (pos. 8.1):
➤
Turn down the speed of the agitator by using the regulator (pos. 8.1).
➤
Disconnect it from the air/power source.
Settings on the mixer (circulate - CLOSED)
➤
Turn lever on the external mixer:
➤
SPRAY lever (pos. 13.2) to “CLOSED”.
➤
FLUSH (pos. 13.3 A / B) to “CLOSED”.
➤
CIRCULATE (pos. 13.1) to “CLOSED”.
➤
Insure that all air pressure regulators (main pump, feed pumps, flush pump) are
adjusted back to 0 bar.
➤
Press the STOP button (pos. 1.2).
➤
Close the air cut-off ball valve (pos. 2.1).
Result: Depending on the steps followed the unit is now prepared for a pause or
finishing work with the machine. All crucial areas on the machine were flushed
with thinner.
6.4
Material Change
➤
Clean System thoroughly (see chapter “Complete Cleaning”)
We recommend,
➤
disassemble the material pumps and completely clean them thoroughly
➤
to clean the high pressure filter. It may be necessary to disconnect the housing from
the hoses and clean it separately (See chapter 8.2.1).
➤
to remove the dirt collector, clean it and insert it again (See chapter 8.2.2).
➤
start the machine again (refer to chapter “Initial operations”).
➤
For changeover from epoxy materials to polyurethanes, the whole system must be
thoroughly, completely and properly cleaned to avoid serious problems occuring as a
result of chemical reactions. Before filling the system with the new material, it has to
be cleaned with thinner according to the material being used.
Before every material change please contact
-customer service to get the
right choice of packing rings.