Translation of the original Operation Manual
6-1
•1307_PU280_SV1018DV1020_BAoDB_en•ski
en
6
Operation
1x
1x
2x
Always wear the specified protective clothes.
➤
The equipment has been prepared as specified in chapter
Checklist:
Short description
Test state
Comment
Connection including earthing
Material is available
+
Compressed air connection
closed
Compressed air supply
0 bar
Electrical connection
System vented
Circulation / relief
closed (optional)
Spray gun
secured
Pressure tests
Separators
1.
Switch on the equipment
Switching the unit on
(press the green button)
Figure 6.1
2.
Secure material supply
➤
Open the shut-off valves for compressed air and material (optional) on each
feed pump.
Figure 6.2
The following is required
Prerequisites
Note!
Always observe and follow
the warnings and data
sheets of the material
manufacturer.
Attention!
Make sure that the equip
-
ment is never left unat
-
tended during operation!
In events of emergency
you must be able to react
instantaneously!
Summary of Contents for DUOMIX PU280
Page 68: ......