26
Translation of the original operation manual
HERKULES PFP
HERKULES PFP_BAoDB_en_1402_B · rs
Operation
15.
Close and lock the spray gun.
16.
Set the ram control lever to position “Up”, to move the ram with the pump up.
17.
Once there is sufficient space for removing the flushing agent container, set
the ram control lever to position “Stop”.
18.
Remove the flushing agent container.
19.
Screw on the follow plate with seal.
5.1.3 Adjust the deicing system
1.
Turn the adjusting screw for the deicing
system at the air motor slowly counter-
clockwise – minimum one and maximum
three turns.
Exact settings should be made individually
and as required because the degree of icing
depends on various factors, such as e.g. pres-
sure, number of double strokes per minute, air
humidity, ambient temperature.
Fig. 14: Adjusting screw for the
deicing system
When interrupting work or in case of decommissioning the adjusting screw of
the deicing system remains open.
5.1.4 Preparing the material to be applied
Observe the technical notes of the respective material manufacturer.
1.
If necessary, heat up the containers of the A and B component to the pro-
cessing temperature recommended by the material manufacturer.
2.
If permissable for the material used, mix
some solvents into the A component using
the hand mixer.
3.
Mix the B component into the A compo-
nent using the hand mixer.
4.
Clean the hand mixer with solvent and
leave it standing in the container with sol-
vent. This work is best done by a second
person so that there is no loss of working
time for the mixed material.
Fig. 15: Mixing of material