Manual_S5_Airplus_2015_04_20
Page 34 / 68
©
Wodtke GmbH - Tübingen. All Rights and Changes Reserved.Printed 04/2015
Part No. 950 976
13
Initial Commissioning
Once the furnace has been properly installed, con-
nected and
accepted by the authorised district
chimney sweep
or the responsible local author-
ity, as well as filled with pellets, initial commission-
ing can be carried out.
You must first be instructed by your designated
specialised dealer, as well as study the enclosed
instructions.
Be absolutely sure that there are no more acces-
sories in the ash drawer, as they can melt / burn
and damage the furnace.
The following accessory parts are part of the
scope of supply of the furnace and must be re-
moved before commissioning:
Combustion chamber (Fig. 61):
Glass cleaner
Instructions
Quick-start instructions
Cleaning brush
Rear wall:
Cleaning brush
Snake design handle (for opening the
combustion chamber door)
Fig. 61: accessories in the combustion chamber
13.1 Important Notices
Before commissioning in Germany, the
heating system must be accepted by the
authorised district chimney sweep. This
authority issues the operating permit.
Always keep combustion chamber door
closed, even when in a cold state.
Never use combustible or highly flammable liq-
uids for igniting.
The door with the ceramic glass pane be-
comes very hot during operation. Take care
not to touch the pane.
The panelling can also become hot during con-
tinuous operation. Use the supplied heat-re-
sistant glove.
Do not leave children or young people near the
furnace unattended!
All steel and cast parts of the furnace have
been coated in the factory with highly heat-re-
sistant paint and fired. When heating up the
new furnace for the first time, the paint under-
goes a final drying process, which can create
odour and smoke! Please observe the follow-
ing suggestions:
o
No people or pets should remain in the
room during this process, as the va-
pours emitted can be hazardous to
health!
o
Ventilate the room well so that the va-
pours that are released can be re-
moved.
o
During the curing period, the paint is
still soft. Do not touch painted surfaces
in order to prevent damage to the paint
surface.
o
The paint finishes curing after operat-
ing for a while at high heating output.
Attention:
the furnace may never be operated
without the cast grate!
the cast grate may not be removed /
pulled during operation of the furnace!
Do not insert cast grate skewed (door will not
close)