Manual_S5_Airplus_2015_04_20
Page 4 / 68
©
Wodtke GmbH - Tübingen. All Rights and Changes Reserved.Printed 04/2015
Part No. 950 976
1
Important General Notices
Please read all instructions and information
before installation and commissioning. By do-
ing so, you will prevent malfunctions and op-
erating errors.
The
operator
must become informed regarding
the particular features of the heating system and
the appropriate fuels
before commissioning the
heating system
based on the instructions.
The local, applicable regulations and rules (e.g.
state building codes, FeuVo (fire-heating installa-
tions ordinance), industry rules for heating and hot
air heating system construction, etc.) must be ob-
served. We unfortunately can accept no liability for
changes which occur after printing of this docu-
mentation, or for typographical errors. We reserve
the right to make changes without notice. These
units are not intended for use by people (including
children) who have impaired physical, sensory or
mental capabilities or lack experience and/or
knowledge, unless they are supervised by a per-
son responsible for their safety or have received
instructions from said person regarding how the
units are to be used. Children must always be su-
pervised in order to ensure in particular that they
do not play with the units or come into contact with
hot surfaces.
In Germany, the heating system may only be com-
missioned after the authorised district chimney
sweep has issued an operating permit. Inform the
authorities promptly if you are planning the instal-
lation or modification of a heating system. Your au-
thorised district chimney sweep will be happy to
advise and assist you in advance.
Work
, such as particularly i
nstallation, assem-
bly, initial commissioning
and
service work
as
well as repairs may only be performed by a
trained, specialist company (heating or hot air
heating construction). In the case of improper in-
terventions, all warranties and guarantees are
void. See also the chapter Proper Use.
During
final acceptance
, the specialist company
must always instruct the operator of the system in
the operation, cleaning and maintenance of the
system, in a thorough and qualified manner. In
particular, the use of appropriate fuels, regularly
required cleaning by the operator, required
maintenance and safety instructions must be ad-
dressed. All warranties and guarantees are void
particularly in the case of non-compliance with in-
structions, as well as with specified cleaning and
maintenance requirements.
Before commissioning, ensure that all
accesso-
ries have been removed from the combustion
chamber and ash pan
and that the pellet con-
tainer is free of residue (e.g. construction debris,
screws...).
The operator must regularly
clean
the heating
system.
We recommend the completion of a maintenance
contract between a specialist dealer and the oper-
ator for
maintenance
of the heating system. Reg-
ular maintenance can also be performed by the
operator, if the operator is technically experienced
and soundly instructed by a specialist company.
Disconnect power plug before working on the fur-
nace!
The power plug and the related socket must be
easily accessible at all times. Operation of the unit
with a damaged power cable is prohibited. If the
power cable is damaged, it must be immediately
replaced by a qualified engineer or wodtke cus-
tomer service, in order to prevent dangers.
Do not pull power plug during operation! First
shut down the unit and wait for the fan stop
delay to complete (G OFF).
With correct operation / control and good
maintenance / service, you will increase the
value retention and extend the service life of
your wodtke Pellet Primärofen. You will save
valuable resources and protect both our envi-
ronment as well as your wallet.
The "crazy.nrg" model PO 03-5 is delivered
with separate side covers. These must be in-
stalled before commissioning. The unit may
not be operated without side covers. See the
enclosed assembly instructions!