Operating the Wöhler BC 600 via the app
52
8.7.2 Multi-Point Test - Preparation
Fig. 50: Building preparation checklist
•
Tap CHECKLIST in the view MULTI-POINT
TEST - PREPARATION (Fig. 48) to display
the Building preparation checklist (that re-
quires that you have previously selected the
measurement method, because the checklist
is determined by the measurement method).
•
Check the individual points on the checklist
against the building to be tested and carry out
the corresponding measures.
NOTE!
The requirements are set in accordance with FLiB
recommendations, see chapter 5.1. If necessary,
you can make changes to the checklist. It is es-
sential that the changes are documented in the
measurement protocol.
•
To change the requirements tap the corre-
sponding arrow (>) in the checklist. In the dia-
log box that opens make an appropriate selec-
tion again. You can also enter a comment.
•
Tap APPLY to save the edited checklist.
The edited checklist is included in the printout of
the protocol following the measurement.
The view MULTI-POINT TEST - PREPARATION
is displayed again.