6
3062347_0309
440
Dimensions
Gas fired combi
boilers
Gas fired boilers
1
Heating flow
Heating flow
2
DHW
DHW flow
3
Cold water
DHW return
4
Heating return
Heating return
5
Gas connection
Gas connection
Installation inside a cupboard
For installation of the gas fired boiler inside a cupboard
note the following:
Never install the gas fired boiler on the back wall
of the cupboard, as it may not be substantial
enough to take the boiler's weight. This would
create the risk of water and gas leaks which in
turn would result in a risk of explosion
and flooding.
- Removing the rear wall of the cupboard
Minimum lateral clearance between the gas fired boiler
and the cupboard sides 25 mm.
A cutout of 410 x 550 mm is required in the
cupboard top. Otherwise there is a risk of
suffocation and poisoning
With open flue gas fired boilers the
ventilation grill in the cupboard door must
be installed with a free minimum diameter
of 600 cm
2
Otherwise there is a risk of suffocation
and poisoning
3
1
2
4
5
3
1 2
4
5
Min.400
Min.400
>25
694
366 CGU-2(K) 18
380 CGU-2(K) 24
258 CGG-2(K) 18/24
344
120
176
170
39
49
855
393
190
226
(CGG-2)
(CGU-2)
73
134
Summary of Contents for CGG-2-18
Page 64: ...64 3062347_0309 Notes ...